N+MgO 4(2)
45% GELAMIN®
ILSAMIN MMZ is a GELAMIN®-based foliar fertilizer with complexed magnesium, manganese and zinc.
- it cures and prevents the specific deficiencies of citrus and other fruit plants.
- It fosters photosynthesis process and enhances leaf color.
- It stimulates fruit swelling, increases fruit weight and contrasts fruit drop.
ILSAMIN MMZ has to be supplied by foliar way, in fruit and horticultural crops, reducing fruit losses.
COMPOSITION
-
Total Nitrogen (N) 4 %
- Of which: Organic Nitrogen (N) 4 %
- Water soluble Magnesium (MgO) 2 %
- Water Soluble Manganese (Mn) 0,2 %
- EDTA chelated Manganese (Mn) 0,2 %
- Water-soluble Zinc (Zn) 1 %
- EDTA chelated Zinc (Zn) 1 %
- Organic Carbon (C) 15 %
- pH 6,5 +- 0,5
- DENSITY 1,22 +- 0,02 kg/dm3>
- CONDUCTIVITY E.C. 1,80 +- 0,20 dS/m
Doses and methods of use of the fertilizer
-
Cereals
-
Corn2-3 kg/haAlone or in association with herbicidesFoliar
-
Rice3-5 kg/haFrom stem elongation to bootingFoliar
-
-
Citrus
-
All2-4 kg/haEvery 10 to 20 days as neededFoliar
-
-
Fruit
-
Blackcurrant2-4 kg/haEvery 10 to 20 days as neededFoliar
-
Blueberry2-4 kg/haEvery 10 to 20 days as neededFoliar
-
Pomegranate2-3 kg/ha2-3 applications every 7-12 days from the first flower budsFoliar
-
Raspberry2-4 kg/haEvery 10 to 20 days as neededFoliar
-
Redcurrant2-4 kg/haEvery 10 to 20 days as neededFoliar
-
-
Industrial Crops
-
Hop2-3 kg/ha2-4 applications every 10-15 days from 10-15 cm sproutsFoliar
-
-
Leafy vegetables
-
Artichoke2-2,5 kg/haEvery 7 to 15 days during growth and development of the flower headsFoliar
-
-
Legumes and potatoes
-
Potato2-4 kg/ha2-4 applications every 8-10 days in full vegetative development
-
-
Olive Tree
-
All3-5 kg/haEvery 12-15 days from fruit filling to ripeningFoliar
-
-
Pome fruits
-
All2-4 kg/haEvery 10 to 20 days as neededFoliar
-
-
Stone fruits
-
Cherry2-4 kg/haEvery 10 to 20 days as neededFoliar
-
-
Vegetables
-
Cauliflower2-4 kg/haEvery 10 to 20 days as neededFoliar
-
Eggplant2-4 kg/ha2-4 applications every 8-10 days in full vegetative developmentFoliar
-
Pepper2-4 kg/haEvery 10 to 20 days as neededFoliar
-
Processing Tomato2-4 kg/haEvery 10 to 20 days as neededFoliar
-
Watermelon2-4 kg/ha2-4 applications every 8-10 days in full vegetative developmentFoliar
-
Dosages are purely indicative and may vary depending on pedoclimatic conditions and average yields expected.